MARYLEBONE RAILWAY STATION
LONDON, UK

NSS designed and built a special access system to enable Marylebone Station to undergo a complete re-roofing programme while continuing to serve the 30,000 passengers who pass through the station each day.

The interior crash deck was erected from inside the station, clear of the floor to maintain full passenger access. The top of the deck was covered with nonslip waterproof plywood, giving a very clear, safe and gap-proof platform.

To prevent the ingress of rain water, a mobile steel sheeted roof was erected to one third of the roof on two tracks, with a 30m clear span.

A 5kN per m2 crash deck was erected on a side street to store the cladding and roofing materials, complete with a 2 ton SWL electric hoist, cantilevered 6m over the pavement into the roadway. This allowed deliveries to be made during the night without the use of expensive mobile cranes.

---------------------------------------------------------------------------------------------------------

UK CONTRACTS

MIDDLE EAST

SOUTH EAST ASIA

 
 
 
  MIDDLE EAST - Khalifa Stadium Doha, Quatar
 
The 27m span system gave access to the soffitt sheeting, supported off a tracked tower at the rear of the stand.
Read More »
 
  SOUTH EAST ASIA - Chek Lap Kok Airport, Hong Kong
 
Chek Lap Kok, the biggest and busiest airport in China, was built on a man-made island, 10km from Hong Kong.
Read More »
 
Tel: 0845 450 1900
Fax: 0845 450 1901
Email: info@nssgroupplc.com
www.nssgroupplc.com
NSS Group plc, Access House, Aviation Park, Flint Rd, Saltney Ferry, Cheshire. CH4 0GZ.